Client:Van der Knijff
Date:24 March 2013

DRY DIGESTION

Plant location Zeewolde / Flevoland / Netherlands
Process Plug- flow digestion
Capacity 35.000 tons of co-products and manure per year
Digester Plug flow 2 x 770 m3
Hydrolysis 1 x 450 m3
Secondary digester 1 x 4400 m3
2.000 m3 Liquid storage
2.400 m3 Double membrane biogas storage
CHP 2 x 713 kW
Start-up 2008
Annual energy profit € 1.260.000