DRY DIGESTION

Plant location Zeewolde / Flevoland / Netherlands Process Plug- flow digestion Capacity 35.000 tons of co-products and manure per year Digester Plug flow 2 x 770 m3 Hydrolysis 1 x 450 m3 Secondary digester 1 x 4400 m3 2.000 m3 Liquid storage 2.400 m3 Double membrane biogas storage CHP
Continue Reading →

PUBLIC BUILDING

The 21-floor multi purpose federal facility Phillip Burton Federal Building chose Flex turbine MT250 to achieve the maximum available energy savings
Continue Reading →

LIQUID DIGESTION

Plant location Tirns (Wybritseradiel)/ Netherlands Process Intensively mixed thermophillic digester Capacity 20.000 tons/year manure and co-products Digester 1.200 m3 Hydrolysis 1 x 300 m3 Secondary digester 1.700 m3 CHP 2 x 346 kW Start-up 2008 Annual energy profit € 620.000
Continue Reading →

FACTORY

The surgical and medical instruments Ethicon facility chose FlexEnergy Turbine MT250, as a consistent provider of on site heat and electrical energy
Continue Reading →

HOSPITAL

The John Muir Medical Center’s Walnut Creek expanded a Central Utility Plant with a plan to increase energy efficiency and reduce grid-purchased power.
Continue Reading →

LABORATORY / OFFICE

Wareham Development offered their tenants the unique benefit of low cost energy and reliable power, by installing 3 250kW Flex Turbine MT250s
Continue Reading →

Landfill

Ventura Regional Sanitation District took advantage of the landfill gas, by installing the FlexTurbine, affirming its’ commitment to renewable energy and environmental stewardship
Continue Reading →

DRY DIGESTION

Bio-Reactor Type Plug FlowLength 80 ft x Wide 24 ft x Height 27 ft Total Volume48,000 ft3 – Liquid 41,000 ft3 ; Biogas 7,000 ft3 Process Parameters Thermophilic Temperature Range135-140oF Dry Digestion at Total Solids of Over 30% Reduced Retention Time 21-23 Days Required Land T
Continue Reading →

FIELD CROPPING

Media:……..2013-06-21 Location Tufeni, OLT, ROMANIA Kind of company Field cropping, swine farm Digesters 2 x (1750 m3 substrate + 1100 m3 biogas) – mesophilic Hydrolysis 1 x 125 m3 Secondary digester 1 x 4150 m3 substrate + 2550 m3 biogas CHP 2 x 400 kW Substrate Appr
Continue Reading →